Solar PV System Inspections – Coleg Cambria
Our team has completed inspections on three Solar Photovoltaic systems across the Coleg Cambria Deeside & Northop campus’s.
The visit focused on:
- Assessing the overall condition of each installation
- Verifying operational performance and identifying any factors limiting generation
- Highlighting remedial works required to restore or improve system efficiency
- Ensuring all arrays are generating at their optimum capability
These inspections form part of our ongoing commitment to helping clients maximise renewable energy output, maintain system health, and extend asset lifespan.
